PROCEDURES FOR OBTAINING BUILDING PERMITS

1. COPY OF APPLICATION FOR SEPTIC SYSTEM FROM MARION COUNTY DIVISION OF GROUNDWATER, 110 Gamble Lane, Jasper, 942-8018.  If an existing system is going to be used you will need to obtain a Verification of System Form from Groundwater.

2. TWO (2) SETS OF BLUEPRINTS OR DRAWINGS TO SCALE. AFTER THE BUILDING INSPECTOR INSPECTS THE PLANS, ONE SET STAYS ON FILE IN THIS OFFICE, THE OTHER SET MUST STAY ON THE JOB SITE AT ALL TIMES.

3. COPY OF THE TAX MAP SHOWING THE SITE, WITH MAP AND PARCEL NUMBERS. THIS CAN BE OBTAINED FROM THE TAX ASSESSOR'S OFFICE (2ND FLOOR IN THE COURTHOUSE).

4. PLOT PLAN WITH PROPOSED STRUCTURE(S) ON LOT - SHOWING SETBACKS.